Shanghai Rail Transit Line 13 Ventilation Shaft Noise Reduction Project
Engineering Picture
Shanghai Rail Transit Line 11 Sound Barrier Project
Engineering Picture
Fire Door Project of Shanghai Rail Transit Line 10
Engineering Picture
The first phase of the sound barrier project of Nanjing Metro Line 2
Engineering Picture
The first phase of the noise barrier project of Nanjing Metro Line 2 started in October 2009 and was completed in January 2010. The project includes the design, manufacture, installation and maintenance of double-sided high-slip sound barriers.
Beijing-Shanghai High-speed Railway Sound Barrier Project
Engineering Picture
The Beijing-Shanghai high-speed rail sound barrier project started in December 2010 and was completed in January 2011. The project includes the processing and transportation of the sound barrier.
Shanghai-Kunming High-speed Railway Sound Barrier Project
Engineering Picture
The Shanghai-Kunming line sound barrier project started in July 2010 and was completed at the end of 2010. The project includes the production and transportation of metal sound-absorbing screens.