The Wuhan Caidian Line project started in January 2018 and was completed in September 2018. The total length of the line is 16.05km, of which the elevated line is about 2.9km, with a fully enclosed sound barrier of 1,356m and a vertical sound barrier of 1824m in the 4 sections of the elevated section.