Case Show
Acoustic Engineering for the Oriental Arts Center
Engineering Drawings Oriental Art Center: Construction began in September 2004 and was completed in October 2004. The project scope included the fabrication, installation, and maintenance of acoustic panels, fire-rated soundproof doors, and their associated components.
Yunnan Chuxiong Converter Station Noise Reduction Project
Engineering Images The Yunnan Chuxiong Converter Station is the world’s first ultra-high-voltage direct-current transmission project, as well as China’s first domestically developed demonstration project for UHV DC transmission. Construction of the noise control project at the Yunnan Chuxiong Converter Station began in January 2012 and was completed in August 2012. The project involved the fabrication and installation of sound barriers, soundproof windows, soundproof doors, along with related auxiliary materials.