这是描述信息

27 Years of Focus

Noise control integrated service provider

手机
24-Hour Hotline
13816209756
热线
National Hotline
(021)56625662
Case Show
Case Show

Your location:
Homepage
/
/
/
Shunbei Oil and Gas Field No. 5 Joint Station Noise Reduction Project
Number of views:
1000

Shunbei Oil and Gas Field No. 5 Joint Station Noise Reduction Project

Category
Oil
  Engineering Picture         The No. 5 Joint Station of Shunbei Oil and Gas Field of Sinopec Northwest Oilfield Branch is located in Gaizi Kum Township, Shaya County, Aksu Region, Xinjiang Uygur Autonomous Region. The main reason is that the noise of production equipment exceeds the standard during operation. Stabilize the noise of the compressor room for control. The owner requires that when each equipment is running, the indoor and outdoor noise must be controlled within the decibel range required by the national standard and design drawings, and a third-party inspection and certification report related to noise reduction should be issued. The project will start on January 4, 2021 and will be completed on May 31, 2021.
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
Case Description
Parameters

  Engineering Picture

 

Shunbei Oil and Gas Field No. 5 Joint Station Noise Reduction Project Shunbei Oil and Gas Field No. 5 Joint Station Noise Reduction Project
Shunbei Oil and Gas Field No. 5 Joint Station Noise Reduction Project Shunbei Oil and Gas Field No. 5 Joint Station Noise Reduction Project

 

 

 

The No. 5 Joint Station of Shunbei Oil and Gas Field of Sinopec Northwest Oilfield Branch is located in Gaizi Kum Township, Shaya County, Aksu Region, Xinjiang Uygur Autonomous Region. The main reason is that the noise of production equipment exceeds the standard during operation. Stabilize the noise of the compressor room for control. The owner requires that when each equipment is running, the indoor and outdoor noise must be controlled within the decibel range required by the national standard and design drawings, and a third-party inspection and certification report related to noise reduction should be issued. The project will start on January 4, 2021 and will be completed on May 31, 2021.

Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table

Related Cases

Noise Reduction Project of Shanghai Banknote Printing Factory
  Engineering Picture    
Shanghai Jiaotong University anechoic room project
  Engineering Picture    
Shanghai Testing Center Laboratory Noise Reduction Project
  Engineering Picture