Anhui Xuancheng Power Plant Noise reduction project
Number of views:
1000

Anhui Xuancheng Power Plant Noise reduction project

Category
Power Grid
  Engineering Picture       The construction of the cooling tower noise reduction project of Anhui Xuancheng Power Plant started in December 2014 and was completed in May 2015. The engineering volume includes sound-absorbing and insulating screens, sound-proof doors and related auxiliary materials.  
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
Case Description
Parameters

  Engineering Picture

 

Anhui Xuancheng Power Plant Anhui Xuancheng Power Plant
Anhui Xuancheng Power Plant Anhui Xuancheng Power Plant

 

 

The construction of the cooling tower noise reduction project of Anhui Xuancheng Power Plant started in December 2014 and was completed in May 2015. The engineering volume includes sound-absorbing and insulating screens, sound-proof doors and related auxiliary materials.

 

Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table

Related Cases

Noise Reduction Project of Shanghai Banknote Printing Factory
  Engineering Picture    
Shanghai Jiaotong University anechoic room project
  Engineering Picture    
Shanghai Testing Center Laboratory Noise Reduction Project
  Engineering Picture