All categories
Number of views:
1000
High-speed sound barrier with salt
Category
Municipal Roads
Retail price
0.0
元
Market price
0.0
元
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
Case Description
Parameters
Engineering Picture
![]() |
![]() |
![]() |
![]() |
The sound barrier project for the Yancheng section of the Lianyan Expressway started in September 2007 and was completed in December 2007. The engineering volume is the production, installation and maintenance of sound barriers (subgrade section) and sound barriers (bridge section) and related materials totaling approximately 1,000 linear meters.
Scan the QR code to read on your phone
Previous
None
Copyright © 2021 Shanghai Shenhua Acoustic Equipment Co., Ltd. 沪ICP备2021020513号-1
Power By:www.300.cn